Zur Navigation springen Zum Inhalt springen Zum Footer springen
Stein-Wingert

Historische ijzerertsmijn “Geconsolideerde Sonnenberg

Detailed description

This is the "New Deep Tunnel" of the mine "Consolidated Sonnenberg" which was established in the late 19th century.

According to the "Description of the Mining District of Hamm an der Sieg" (1855), the mine was initially operated from the surface through shafts and later received two tunnels. One of the tunnels, the one described here, "brought in a depth of 80m underground." Iron, lead, and zinc were extracted. It wasn't until the beginning of the 19th century that "the Sonnenberg," having not seen a "real miner" for a long time, tried a local resident to cultivate mushrooms in the dark and damp corridors and even built a small material cable car across the Nister. However, the hopeful project had to be abandoned.

Since then, bats have returned to their traditional winter quarters.

A protective grid keeps unwanted guests out.

Rhein-Zeitung, No. 276 from 28.11.1995

 

Brief description

This is the "New Deep Tunnel" of the mine "Consolidated Sonnenberg" that was established in the late 19th century.

According to the "Description of the Mining District Hamm an der Sieg" (1855), the mine was initially operated from the surface through shafts and later received two tunnels. One of the tunnels, the one described here, "brought in a shaft of 80m underground." Iron, lead, and zinc were mined. It wasn't until the beginning of the 19th century that "Sonnenberg" had not seen a "real miner" for a long time; a local tried to cultivate mushrooms in the dark and damp passages and even built a small material cable car across the Nister. However, this hopeful project had to be abandoned.

Since then, bats have felt comfortable in their traditional winter quarters again.

A protective grid keeps unwanted guests out.

Rhein-Zeitung, No. 276 from 28.11.1995

 

Contact and directions

If you decide to use Google Maps, your personal data will be processed by Google Inc. 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA. Google's privacy policy then applies: www.google.com/intl/de_de/help/terms_maps.html Plan arrival

Hauptstraße Alhausen
57629 Stein-Wingert

Contact

0049 96 99 760